Váš prohlížeč je zastaralý!

Pro správné zobrazení těchto stránek aktualizujte svůj prohlížeč.Aktualizovat prohlížeč nyní

10. 6. 2024
author: Tereza Tůmová

The bike path between Jakuby and Nebočady is temporarily closed

After an inspection of the rock massif by a geologist, it was determined that the work on removing loose rocks on road No. 261 will continue until Friday, June 14. For this reason, the road and the bike path in the Jakuby – Nebočady section will be closed during this period. It is possible to pass through with caution only when the work is interrupted. Otherwise, it is necessary to bypass the area through the local part of Všeraz.